Fleet assessment
Sixty reports, three laboratories, one budget meeting
A fleet assessment runs the DGA and oil test history you already have through RONIN by Seetalabs and returns every transformer ranked by condition, with the method behind each result, what is missing, and an action plan by window.
A paid engagement, agreed before any data is exchanged. For five transformers or fewer, Fleet DGA Triage ranks them by DGA urgency, free, in your browser.
How it works
Four steps, and the first one is a conversation
- Step 1 of 4
Scope
We agree the transformers, the data you have and the question the budget has to answer. You receive a written offer.
before any data - Step 2 of 4
Data
You send the laboratory files as they are, PDF, Excel or CSV, through an agreed channel. Values, units, dates and asset identity are reviewed with you before any calculation.
reviewed with you - Step 3 of 4
Assessment
RONIN reads each sample with the methods that apply to its fluid, signs an index where the data allows it, and names what is missing.
method, edition, clause - Step 4 of 4
Results
The ranked fleet, an Asset Health Report per transformer and the action plan, with the option to continue in RONIN.
yours to keep
What comes back
Every transformer ranked, with the reason and the clause
Worst first, with the recommended action on every row and the rated capacity by band.
What you receive
- The fleet ranked by condition, worst firstthe action on every row
- Per transformer: the diagnosis for its fluid and the tests that are missingnamed, never guessed
- An action plan with the clause behind each actionwindow and planning estimate
- An A4 Asset Health Report per transformerverification code and QR
How the ranking is built
Each sample is read with the methods that apply to its fluid: IEEE C57.104-2019 and IEC 60599:2022 for mineral oil, IEEE C57.155-2014 for esters, oil and paper property by property under IEC 60422:2024 and IEEE C57.140-2017. The health index is signed by the model, with its uncertainty band, or by the standards on measured values only.
Planning estimates are stated at your country's price level and are not quotations. The decision stays with the engineer responsible for the asset.
- 1EST1 230kV 8MVAVery Poor6.8standardsnatural ester16 Aug 2007Within 30 days
- 2EST2 20kV 3.5MVAVery Poor6.8standardssynthetic ester9 Jun 2010Within 30 days
- 3AT2 250MVAVery Poor11.4 ± 1.9modelD2Status 321 Jan 2026Within 30 days
- 4GSU4 330MVAPoor37.2 ± 6.6modelT3Status 317 Jun 2026Within 30 days
- 5TR1 125MVAFair66.4 ± 6.0modelT1Status 321 Jan 2026Within 30 days
- 6TR3 250MVAVery Good85.2 ± 7.7modelno zoneStatus 121 Jan 2026Within a year
- 7TR5 150MVAVery Good92.1 ± 7.0modelno zoneStatus 18 Nov 2025Within a year
591.5 of 1,116.5 MVARated capacity in Poor or Very Poor
- Very Poor 261.5
- Poor 330
- Fair 125
- Very Good 400
Prefer to look first? See the whole path on a demo fleet.
Explore the guided demo